CHARGEBOOST addresses a barrier to deploying fast and ultra-fast charging: limited grid connection capacity. The project develops an energy management system (EMS) that coordinates buffer batteries, power electronics and chargers to match charging demand to the available capacity.

High-power charging with buffer storage
The battery acts as intermediate storage, or a buffer: it stores energy when demand permits and supplies additional power during charging. The EMS coordinates energy flows and equipment operating limits, including the integration of photovoltaic generation.
The proposal explores stations with peak charging power of 100–300 kW using grid connections of 10–30 kW. These figures are design targets subject to storage sizing, usage frequency and validation of each configuration, not a guarantee of continuous supply.
Abervian's technical development
- Sizing and simulation: analysis of charging profiles, battery capacity and power, solar generation and grid connection constraints.
- System architecture: selection of storage, converters and control platform, considering integrated solutions and retrofits of existing installations.
- Communications and EMS firmware: equipment integration, variable monitoring and development of control logic and operating limits.
- Validation: development of simulation tools and a test bench to assess EMS behaviour under different use cases.
Collaboration with LOMARTOV
Abervian is the coordinating beneficiary and leads technical development. LOMARTOV contributes environmental assessment through life cycle analysis, identifying the solution's main impacts and opportunities for improvement. The work includes environmental indicators in the assessment of charging strategies.
Duration and funding
- Duration: 2024–2025.
- Abervian budget: 39.980 €.
- Abervian grant: 39.980 €.